New Mexico Energy Planning
Overview
In 2023 New Mexico will use a new process to engage those invested in and impacted by New Mexico’s energy infrastructure, giving stakeholders an opportunity to shape key decisions about how much new electric infrastructure is needed and how to get it. The process is open to all stakeholders.
Background
This process was set in motion in the fall of 2022 when the New Mexico Public Regulation Commission (PRC) enacted new procedures for the state’s investor-owned electric utilities to follow as they file their 20-year Integrated Resource Plans (IRP). These plans are a critical instrument in determining the future of energy in New Mexico. The PRC’s final order (Sept 2022) and final order upon reconsideration (Nov 2022) describe the requirements.
Public Service Company of New Mexico, filed their 2023 IRP on Dec. 15, 2023. The PRC appointed Gridworks as the independent facilitator to lead the stakeholder process, which is intended to advise the utility and reach potential agreements in the utility’s development of two foundational elements of the IRP – the statement of need and action plan. These elements will determine how much new electric infrastructure will be needed and what types of infrastructure will be used to meet that need.
This process was open to all stakeholders invested in and impacted by New Mexico’s energy infrastructure.
To see a copy of the submitted plan:
PNM’s 2023 Integrated Resource Plan
PNM-2023-IRP-Appendices-Volume-1
ERRATA TO PNM IRP 18Dec2023.pdf
Staff Memo Gridworks Feedback PNM Stakeholder Process 12/22/2
The Gridworks report on results from the facilitated stakeholder process are available here:
Gridworks Slide Deck– PRC Briefing 1/15/2024
If you have questions, contact info@gridworks.org.
Working Materials
Past Meetings:
- Meeting #11: Reflections on the process (Dec. 19, 8-9:30am MDT, via Webex)
- Read -ahead material
- Meeting #10: (Oct. 19, 9-11am MDT)
-
- 10/19/23 – Meeting Summary
- Slide Deck -PNM 2023-2042 IRP: Modeling Results Update, Statement of Need, and Action Plan – 10/19/23
- PNM IRP Statement of Need – DRAFT – 10/17/23
- PNM Action Plan DRAFT 2023 IRP – 10/17/23
- PNM Action Plan Mapping – 10/17/23
- Slide Deck – Gridworks IRP Stakeholder Meeting #10 – Final
-
- Meeting (Optional): PNM IRP Stakeholder Input to SoN and Action Plan (Oct. 6 – 9-10am)
- Meeting #9: (Sept. 28, 9-11am MDT)
-
- 9/28/23 Meeting Summary
- DRAFT #2 – PNM Action Plan Mapping Worksheet
- Slide Deck – PNM 2023-2042 IRP: Modeling Results Update V2- 9/28/23
- Slide Deck – Gridworks IRP Stakeholder Meeting #9
- Stakeholder SoN Compared to PNM 2023 IRP Outline
- PNM SoN Skeleton – 9/14/23
- Stakeholder SoN final draft – 8/28/23
-
- Meeting #8: (August 31, 8:30am-12:30pm MDT)
- IRP Modeling Forward Thinking Session (August 22, 9-10am MDT)
- Meeting #7: (July 27, 9-12n MDT)
-
- PNM IRP Modeling Q&A – Meeting #7 – 7/27/23
- 7/27/23 Meeting Summary
- SoN Outline V4-7/28/23
- Meeting Agenda
- Video Recording – IRP Stakeholder Meeting #7 (7/27/23)
- Password: qDdmUHM6
- Slide Deck – Gridworks IRP 7/27/23 Stakeholder Engagement Meeting
- Slide Deck – PNM Modeling Results and Scoring Phases 1-2v4-1-1 8/8/23
-
- Meeting #6: Workshop – (June 29, 9am – 5pm MDT in person) CNM Workforce Training Center 5600 Eagle Rock Ave NE Albuquerque, NM 87113
-
- Workshop Agenda
- Slide Deck – Gridworks 6/29/23 Stakeholder Workshop
- Slide Deck – PNM 2023-2042 IRP: Modeling Results Update
- Slide Deck – Form Energy: Modeling best practices in a decarbonized future
- SoN Outline V2 – 6/26/23
- SoN Parking Lot – 6/29/23
- SoN Input from 6/29/23 Stakeholder Meeting
- 6/29/23 Workshop Summary
-
- Meeting #5: (June 15, 9-10:30am MDT)
- Meeting #4: (June 1, 9-10:30am MDT)
-
- 6/1/23 Meeting Summary
- Video Recording – IRP Stakeholder Meeting #4 (6/1/23)
- Password: CiEmj4Wb
- Slide Deck – Gridworks IRP 6/1/23 Stakeholder Engagement Meeting
- PNM IRP Statement of Need Outline – updated 5/31/23
- “Probabilistic Modeling for NM’s Energy Transition Act, ASME Conference on Energy Sustainability”
- Slide Deck – Update from Modeling Core Group – 6/1/23
-
- Meeting #3: (May 18, 9-10:30am MDT)
-
- Schedule and Registration
- Meeting Agenda
- 5/18/23 Meeting Summary
- Video Recording -IRP Stakeholder Meeting #3 (5/18/23)
- Password: JgJPCMA3
- Slide Deck – Gridworks IRP 5/18/23 Stakeholder Engagement Meeting
- PNM Confidentiality Agreement 2023 IRP Stakeholder Facilitated Process
- Modeling Topics Collected to Date V1 – updated 5/26/23
- Proposed Structure for Modeling Working Group V3 – updated 5/25/23
- PNM IRP Statement of Need
-
- Meeting #2: Workshop – Building a Shared Foundation of Knowledge & Collecting Statement of Need Ideas (May 4, 9am -3pm MDT – in person) CNM Workforce Training Center 5600 Eagle Rock Ave NE Albuquerque, NM 87113
-
- Workshop Agenda
- Statement of Need: System Needs and Requirements
- 2023 IRP Candidate Resources
- 2023 IRP: Modeling and Scenario Analysis Framework, Process Timeline and Scenario Run Requests
- Modeling Inputs For 2023 IRP Analysis
- Slide Deck – Gridworks 5/4/23 Stakeholder Workshop
- Acronym List
- Workshop Summary
- Supplemental Materials from 5/11/23
- Video Recording
- PNM IRP Modeling Information Presentations 5/11/23
-
- Password – Dwg3fwQM
-
- Candidate Resources Table as of 5/12/23
- PNM Modeling Phases/Scenarios Document 5/11/23
-
- Video Recording of the first two tutorial sessions
-
- Written input offered by stakeholders before and during the meeting
- New Mexico Solar Energy Association –“Climate Action 2023-2033(1).pdf”
- Sandia National Labs – “SAND Report, C. Ho.pdf”
- Cynthia Mitchell – “v2 Foundational Issues PNM 2023 IRP.pdf”
- PNM in response to Barbara Chatterjee questions prior to March 29 meeting –
- “Amended IRP Rule (redlined).pdf”
- “Stakeholder Questions 2023054.pdf”
- Interwest Energy Alliance
- Interwest Letter_May 1 PNM IRP_Gridworks
- Goggin PNM IRP final (1)
- Interwest-Sept.-7-IRP-Comments
- Slides-IRP-Steering -Meeting
-
- Meeting #1: Stakeholder Engagement Kick-Off (March 28, 9-10:30am MDT)